- Published on
Despite a few blips in the schedule radar due to weather and transportation issues, our bathroom contractors gave us exactly what we needed with the final grout, fixtures, and drywall work. Also had another consultant stop by and spec out the new shower door, leaving us with a handy shower rod and curtain to use temporarily until final door installation. With all of this progress complete, we’re ready to apply a fresh coat of paint to cover the goldenrod left behind on the walls, this time with something more grayish-colored to match the new design palette. NEXT UP: New vanity, sink, and wall cabinet… and maybe some replacement towel and toilet roll fixtures.
- Published on
The same day I posted that initial blog about our bathroom remodel, the Omaha metro area suffered the most horrific devastation imaginable as the result of a historic wind storm. Fortunately, our bathroom contractors soldiered on and continued installing beautiful porcelain tile, as seen in the images below. Thankfully (and shockingly), we were mostly just impacted by the external damage of minor tree limbs and roof shingles, as well as a water main break resulting in less than 4 hours of no running water. So the project continued on track with only a small blip in the originally scheduled contract radar. Next up: Grouting, fixtures, and waiting for countertop & cabinet.